St. Michael The Archangel Catholic Church, Phase 1 Relocation - Auburn, AL

Landlocked in their current location, St. Michael The Archangel Catholic Church took a bold step toward relocation.  Finding appropriate property along College Street just north of town, St. Michael's construction is underway for their new facility.  With classic lines, yet a hint of contemporary aesthetic, CTSM Architects designed their building to provide exciting new opportunities to minister to the students and other residents of Auburn, Alabama.  Now at home in their new Church building, St. Michael's looks forward to a continuing impact on the lives of those in Auburn.


        Master Plan Rendering


Phase 1 - Floor Plan


Phase 1 Overall Building Computer Rendering


Main entry drive from College Street looking into site at building beyond; note new sign


Panorama exterior view of the Church


Close-Up of South face of Nave


Education wing with fenced in playground and covered entrance


Administration wing at West Main Entrance


East Transept of the Nave


West Transept of the Nave


Southeast corner of the Nave / Sanctuary


Southwest view of Church building with Nave in foreground and west entrance at left


Panorama interior view of the Nave, looking toward Sanctuary with Transepts each side


Interior of Nave looking toward the East Transept


Interior of Nave looking toward the West Transept


Close-Up of new stained glass rose window above altar


Interior of Parish Hall at Dedication Service Reception


Interior central Gathering Space looking at wall to Nave


Interior at Central Gathering Space with Carpet detail


Nave looking at Sanctuary & Tabernacle prior to Dedication Service


Nave looking toward Sanctuary & Tabernacle decorated for Christmas


View of Sanctuary area with Tabernacle backdrop


Close-Up of Baptismal Font relocated from former facility


Welcome Center desk with soffit and ceiling at entry to Preschool area


Preschool children's corridor with patterned VCT flooring


Sr. High Classroom


Youth Assembly Area


Kitchen with equipment in place, ready for use
 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name (required)

 Email (will not be published) (required)

Your comment is 0 characters limited to 3000 characters.