Growth over the years created the need for multiple buildings, yet a cohesive method to join those buildings seemed elusive.  CTSM Architects teamed with Mt. Zion United Methodist Church to develop a unique connector that doubles as a main covered entry point.  This connector bridges buildings from multiple generations to become a single facility for Mt. Zion.  Creative use of space, ramps, an elevator and other techniques were used to transition from the multiple floor levels into a single main entrance point.  With this forward-looking design comes opportunities to continue their growth without the impedance of isolated structures.  Now occupied, the Church is celebrating the unifying nature of this timely project.


   Rendering of New Entry Connector



New Addition with Elevator Shaft at Right Side of Picture



New Entry Drive Under with Installed Ceiling and Segmental Retaining Wall in background



2nd Floor Addition - Interior finishes complete



2nd Floor Connector Stair



1st Floor Connector Lobby



2nd Floor Connector Lobby
 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name (required)

 Email (will not be published) (required)

Your comment is 0 characters limited to 3000 characters.